With the most recent release of Infralink/IMMS (v.3.5.29), we are happy to offer the following new features and functionality.
InfraLink notification features have expanded to now support SMS (i.e., text messages) in addition to traditional email notifications.
Users receive email notifications based on Case or Work Ticket assignment, subscriptions at the Case level, instance-wide notification rules, or User Profile notification rules. There are situations, however, when urgent response is required by recipients who may not be in front of their email. This may occur when email access is not available on mobile devices or after normal business hours.
As an extension to InfraLink's existing email notification feature, Users can now receive work progress notifications (i.e., those associated with Cases, Work Tickets, and Tasks) via SMS. This text message delivery is dependent on the following:
|
This initial implementation relies on AWS Simple Notification Service (SNS) for the delivery of SMS (text) messages. Additional delivery options may be considered in the future.
What You Will See in the User Interface:
InfraLink allows Users to log Activities (e.g., labor hours, travel time, etc.) for various Work Tickets, Cases, and Tasks, and sometimes Contracts. This information then propagates directly to M.C. Dean Timesheet via an integration service. This integration saves time, improves the accuracy of work records, and results in a comprehensive display of Users' weekly Activities.
Users can log Activities at multiple points within the web application user interface (UI) and the mobile application UI. For example, Users can log Activities when performing Updates or status transitions for Cases and Work Tickets, and if the Instance is configured to support Contract-level Activities (i.e., labor hours not associated with a specific Case), these can be logged via the "Log Activity" widget in the top-level navigation bar (web) or the "Add Activity" option within the Settings menu (mobile).
Regardless of where Users log Activities, the form fields are generally consistent, allowing Users to define the Start Date/Time, Time Spent, Activity Category and Assignees (i.e., who the Activities were performed by).
When logging Activities, the Start Date/Time with the Activities form has traditionally defaulted to the current date and time. As a rule, Activities are logged upon completion. Therefore, the current date and time will never likely be the start date/time. For this reason, and to streamline the User experience, the default Start Date/Time within the Activities form will be set according to the following rules:
What You Will See in the User Interface:
The Job Connect mobile application has supported pin-enabled Drawings. Pins act as a visual means of identifying where a Case is in relation to a Drawing. Case Placement has allowed Job Connect Users to drop a pin onto a Drawing, in effect creating a Case associated with that geographical region of the Drawing. The Root System Element of the Drawing will become the System Element associated with that pinned Case. Not all Drawings support pin-drop functionality. Drawings configured for pin-drop functionality will display "Drawing Enabled for Case Placement" directly under the Drawing name. Is is important to reiterate that pinned Cases are related to Drawings only in terms of geography. A pin-enabled Drawing cannot be altered or edited because the pinned Cases will not move with the new Drawing.
With the release of InfraLink v.3.5.29, Users can now create and view Case placements within pin-enabled Drawings via the web application.
What You Will See in the User Interface:
Please note, upon opening a pin-enabled drawing, it may take 10-15 seconds for the Case placements (i.e., pins) to load. |
Complex System configurations often include individual components, which have their own life cycles and work progressions. In InfraLink, these are represented by Components and Links/Connections, as well as the associated Terminations. These dependencies, while represented in hierarchical and topological formats, were never directly aggregated within any specific views, reports or dashboards.
To know the end state of a System, it is necessary to also know the state and work progression of all dependences of that System. The introduction of the Milestone Progress Report allows Users to quickly and accurately view (in percentage format) the outstanding work for a System, including the tasks that require completion for a System Element and/or the dependencies defined for the associated Components, Links/Connections and Terminations.
The view functions similarly to other grid views with a Filter Panel to the left hand side, the main grid view in the middle, and a Details Panel - upon record selection - to the right hand side. The grid view itself is split into two sections: the top half displays a summary of tasks completed or statuses reached by Location and the bottom half (the Device/Equipment List) displays a summary of tasks completed or statuses reached per the Systems status life cycle. The Device/Equipment List portion allows Users to customize the column display as well as create and share saved views.
What You Will See in the User Interface:
For a System Element Type to appear within the grid view, the Milestone Progress Report field must be checked. Users can do this via the Manage System Element Types grid view.
|
In order for dependencies to be counted in the amount of work left to complete for a System, a Default Status Dependency must be configured within a System life cycle. |
Highlighted features include: SMS Text Notifications via AWS SNS Integration; Rules for Default Activity Start Date/Time; Web Application Support for Case Creation and Case Display on Pin-Enabled Drawings; and Milestone Progress Report View. - |